A meeting at 13:00 on 21st March 2016 at the office of the Water Directorate in Belgrade was held with Serbian stakeholders. The purpose of the meeting was to discuss WRM development scenarios/concepts for the Drina Basin. The power companies (EPS), Srbijavode, Institute for Nature Protection as well as MAEP and members of the Consultant team were represented. In addition to the standard Green Growth and Full HPP maximisation scenarios, the meeting agreed to pursue a concept with focus on irrigation on the lower part of the Drina Basin and on a staged approach over time for full HPP maximisation.   

 1